Adding baseline data
E
Erin Moran
Merged in a post:
Baseline Data
M
Molly Baatz BCBA LBA
Is there a way we are able to manually enter in baseline data for at least three different data points?
Beyond The View Autism Services
Would like to be able to add baseline in manuallly without starting a session, and having to delete the session every time.
Jill Umstattd
Merged in a post:
Adding Baseline Data Manually
M
Melania Pilosian, M.S., BCBA
Can we get a feature to manually add baseline data into the graphs for the times when the baseline has already been collected?
Jill Umstattd
Merged in a post:
Baseline
R
Raymond Moreno M.S., BCBA
May we have these features:
The ability to enter manual baseline data
The ability for all graphs to show baseline data in every new reporting period
See screen shot below as a reference, target behavior been active since 2021 (baseline data) with dates in acquisition showing recent dates such as 2024.
Jill Umstattd
Merged in a post:
Baseline data
L
Layla Alnajjar
Can a feature be added to be able to add baseline data to different targets?
Jill Umstattd
Merged in a post:
Manual enter or change the baseline dates for whole programs
M
Mariah Mansur M.S., BCBA, LABA
I would like to have a way to change the baseline date of a program that gets pulled for the treatment plan or have a way to manually enter them.